World Construction

High Altitude Steel Roof Truck Crane Installation

Jian Hua Wu, Han Shi Lu

Abstract


In order to solve the problems of crane operating range in blind areas and insufficient weight support of crane for steel structure bubble roof lifting construction, it is a must to design propelling crane on the roof, so that it can move on selected routes, completing the lifting work of steel roofing bubble. Mainly introduce the technical measures and related technical preparation of propelling crane on the roof for steel structure lifting process, to ensure the originality of steel structure during lifting process and safety of construction work,also to guarantee the progress of steel structure lifting work.

Keywords


Steel propelling; Hoisting; Crane

Full Text:

PDF

References


Ministry of Housing and Urban-Rural Development of the People’s Republic of China for building structural load specifications: GB50009-2012. (2012).Beijing: China Building Industry Press.

Zhu, X. Q. (2006). “Practical hardware handbook”. Shanghai: Shanghai Science and Technology Press.

Guo, Q. H. (2012). “Discussion on truck crane high altitude assembly and the use of high altitude bulk in steel structure”. Continental Bridge Perspective, (24), 125–126.




DOI: http://dx.doi.org/10.18686/wc.v6i1.85

Refbacks

  • There are currently no refbacks.


Copyright (c) 2017 Jian Hua Wu, Han Shi Lu

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.