World Construction

Study on temporary support of continuous girder bridge in construction

Chun Ming Xu

Abstract


The reasonable design of the temporary support of the continuous girder bridge is a safe guarantee for the smooth closing. According to the characteristics of temporary support of the closed section, the corresponding calculation method is put forward, and then several kinds of temporary support locking devices colmmonly used in engineering practice are discussed. Based on the engineering example, the paper discusses the selection and design of the temporary support form of the construction of the continuous girder bridge. The results show that the transition of the structural system has great influence on the temporary supporting force, and it is feasible to use the external rigid support when the long - span continuous girder bridge decouples the temporary fixed bearing restraint.

Keywords


Closure; Temporary support; External rigid support; Continuous girder bridge

Full Text:

PDF

References


Zhou Zhou, Su Zhi, Yan Donghuang, and so on. Long - span PC continuous rigid frame bridge construction measures [J]. Journal of Changsha University of Science and Technology: Natural Science Edition, 2006,3 (4): 39 -42.

ai Xuguang. Study on Key Techniques and Control Techniques of Cantilever Casting Construction of Continuous Girder Bridge [D]. Xi'an: Chang'an University, 2013.

Choi Hang Hang. Analysis of Construction Process of Closure Section of Prestressed Concrete Cable - Stayed Bridge [J]. Urban Roads Bridges & Flood Control, 2014 (3): 99 - 100.

Jiang Changqing. Construction technology of cantilever casting and closing section of continuous girder of freeway [J]. Science and Technology of West China, 2014, 13 (4): 43 - 44.

Chen Yan. Study on construction technology of cast - in - place concrete continuous girder in railway passenger dedicated line [D]. Chengdu: Southwest Jiaotong University, 2010.

Li Bo. Study on construction technology of prestressed concrete continuous girder bridge [J]. Low Temperature Architecture Technology, 2014 (8): 95 - 97.

Li Zhe. Hang - hua.Study on control technology of cantilever construction of continuous girder bridge in three - dimensional prestressed system [D]. Zhengzhou: Zhengzhou University, 2010.

Lu Hua. Construction of continuous girder middle section of Majihu bridge [J]. Sichuan Water Conservancy, 2013 (5): 59 - 61.

Zhou Xin, Zhang Xuesong, to the rich. Discussion on the closure scheme of continuous girder bridge in cantilever construction [J]. Journal of Highway and Transportation Research, 2006 (4): 96 - 98.

Feng Yuping, Wu Wenming, Zhu Deju. Al.Transformation Control of Closure Segment of Songra River Bridge over Cantilever Construction [J]. Journal of Northeast Forestry University, 2002, 30 (2): 118-120.




DOI: http://dx.doi.org/10.18686/wc.v6i1.80

Refbacks

  • There are currently no refbacks.


Copyright (c) 2017 Chun Ming Xu

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.